Cast-In-Place Retaining Wall: Preliminary Design & Estimate (Non-Engineered)

$1,800.00

Preliminary (non-engineered) package for cast-in-place retaining walls.
What’s included:

  • Plan and section PDF with elevations and layout control
  • Material quantities: concrete, rebar, formwork (budgetary)
  • Budget estimate and construction sequence outline
  • One round of revisions, coordination with a local PE available as add-on

Turnaround: 5-7 business days
Remote service only. No on-site work included.

You may also like